The Relationship Between Project Risk Management Framework and Sustainable Development of Mud Architecture Building in Yemen
Abstract
This study was carried out to examine whether project risk management framework affect the sustainable development of mud architecture building in Yemen. The targeted population in this study was 260 projects of mud buildings implemented in the areas of Wadi Hadramout city. The study utilized a stratified sampling method and divided the population into three strata as represented by the geographical location within the main cities in Wadi. The modelling aspect of the study was performed using the structural formula of partial least squares (PLS-SEM, v3.2.7). The paper revealed the relationship between project risk management framework, and Sustainable Development was found a positive and significant at the level of 0.05. The findings are important contributions for policymakers and practitioners, offering valuable information on how project risk management framework can be integrated to achieve ssustainable development.
References
Ahmed, I., & Manab, N.A. (2016). Moderating Effects of Board Equity Ownership on the Relationship between Enterprise Risk Management and Firms Performance: Data Screening and Measurement Model. Research Journal of Finance and Accounting, 7(6), 2222–2847. https://doi.org/10.9790/487X-18126168
Aloini, D., Dulmin, R., &Mininno, V. (2012). Risk assessment in ERP projects. Information Systems, 37(3), 183–199. https://doi.org/10.1016/j.is.2011.10.001
Apine, A., & Valdés, F.J.E. (2017). Risk Management in Sustainable Projects in the Construction Industry: Cases of Swedish Companies [Master thesis]. Umeå School of Business and Economics.
Baeissa, A.A. (2014). Mud-Brick High-Rise Buildings Architectural Linkages for Thermal Comfort in HadhramoutValley , Yemen. International Transaction Journal of Engineering, Management, & Applied Sciences & Technologies, 5(3), 167–182.
Baker, S., Ponniah, D., & Smith, S. (1999). Survey of Risk Management in Major U.K. Companies. Journal of Professional Issues in Engineering Education and Practice, 125(3), 94–102. https://doi.org/10.1061/(ASCE)1052-3928(1999)125:3(94)
Baloi, D. (2003). Sustainable Construction: Challenges and Opportunities. Association of Researchers in Construction Management, 1(September), 3–5.
Brundtland, G. H. (1987). Our Common Future: Report of the World Commission on Environment and Development. Medicine, Conflict and Survival, 4(1), 300. https://doi.org/10.1080/07488008808408783
Bu-Qammaz, A.S., Dikmen, I., &Birgonul, M.T. (2009). Risk assessment of international construction projects using the analytic network process. Canadian Journal of Civil Engineering, 36(7), 1170–1181. https://doi.org/10.1139/L09-061
Carew, A.L., & Mitchell, C.A. (2008). Teaching sustainability as a contested concept: capitalizing on variation in engineering educators’ conceptions of environmental, social and economic sustainability. Journal of Cleaner Production, 16(1), 105–115. https://doi.org/10.1016/j.jclepro.2006.11.004
Chapman, C., & Ward, S. (2011). How to Manage Project Opportunity and Risk. In OCLC Systems Services (Vol. 22, Issue 4). http://eprints.soton.ac.uk/35673/
Ciancio, D., Jaquin, P., & Walker, P. (2013). Advances on the assessment of soil suitability for rammed earth. Construction and Building Materials, 42, 40–47. https://doi.org/10.1016/j.conbuildmat.2012.12.049
Cooper, D. R., & Schindler, P. S. (2006). Business research methods. In McGraw-Hill (11th ed.). McGraw-Hill.
COSO. (2004). Enterprise Risk Management - Integrated Framework: Executive Summary. In New York (Vol. 3, Issue September). https://doi.org/10.1504/IJISM.2007.013372
Costa, C.S., Rocha, F., & Velosa, A.L. (2016). Sustainability in earthen heritage conservation. Geological Society, London, Special Publications, 416(1), 91–100. https://doi.org/10.1144/SP416.22
Dallas, M. (2013). Management of risk: Guidance for practitioners and the international standard on risk management, ISO 31000:2009 (Issue April).
Falceto, J.C., Mazarrón, F.R., & Cañas, I. (2012). Assessment of compressed earth blocks made in Spain: International durability tests. Construction and Building Materials, 37, 738–745. https://doi.org/10.1016/j.conbuildmat.2012.08.019
Firmenich, J. (2017). Customisable framework for project risk management. Construction Innovation, 17(1), 68–89. https://doi.org/10.1108/CI-04-2015-0022
Garbababa, Y. (2014). Risk Identification and Assessment in Housing Development Projects Using Analytical Hierarchical Process. AHMADU BELLO UNIVERSITY, ZARIA.
Giama, E., & Papadopoulos, A.M. (2012). Sustainable building management: overview of certification schemes and standards. Advances in Building Energy Research, 6(2), 242–258. https://doi.org/10.1080/17512549.2012.740905
Gjerdum, D. (2015). Risk Management’s Standard of Practice – An Overview of ISO 31000 (Issue June). Arthur J. Gallagher & Co.
Gupta, D., Sharma, M., & Shankar Trivedi, D. (2016). Risk Management: Identifying Key Risks in Construction Projects. International Journal of Civil and Structural Engineering Research ISSN, 4(1), 2348–76079.
Hamard, E., Cazacliu, B., Razakamanantsoa, A., & Morel, J.-C. (2016). Cob, a vernacular earth construction process in the context of modern sustainable building. Building and Environment, 106, 103–119. https://doi.org/10.1016/j.buildenv.2016.06.009
Hassan, O.A.B. (2016). An integrated approach to assessing the sustainability of buildings. Journal of Engineering, Design and Technology, 14(4), 835–850. https://doi.org/10.1108/JEDT-12-2014-0077
Hopkin, P. (2010). Fundamentals of Risk Management: Understanding, evaluating and implementing effective risk management. Kogan Page Limited.
Hwang, B., Shan, M., & Supa’at, N. N. B. (2017). Green commercial building projects in Singapore: Critical risk factors and mitigation measures. Sustainable Cities and Society, 30, 237–247. https://doi.org/10.1016/j.scs.2017.01.020
Ihuah, P. W., Kakulu, I. I., & Eaton, D. (2014). A review of Critical Project Management Success Factors (CPMSF) for sustainable social housing in Nigeria. International Journal of Sustainable Built Environment, 3(1), 62–71. https://doi.org/10.1016/j.ijsbe.2014.08.001
Illankoon, I.M.C.S., Tam, V.W.Y., & Le, K.N. (2016). Environmental, Economic, and Social Parameters in International Green Building Rating Tools. Journal of Professional Issues in Engineering Education and Practice, 143(2), 05016010. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000313
Iqbal, S., Choudhry, R.M., Holschemacher, K., Ali, A., & Tamošaitienė, J. (2015). Risk management in construction projects. Technological and Economic Development of Economy, 21(1), 65–78. https://doi.org/10.3846/20294913.2014.994582
Ishak, S. (2015). The Relationship Between Risk Management Committee Characteristics and Modified Audit Opinion in Malaysia [DOCTOR OF PHILOSOPHY]. UNIVERSITI UTARA MALAYSIA.
ISO. (2015). Moving from ISO 9001:2008 to ISO 9001:2015. http://www.iso.org/iso/iso_9001_-_moving_from_2008_to_2015.pdf
ISO 31000. (2009). Risk management Principles and Guidelines. In Risk Management.
Jarkas, A.M., & Haupt, T.C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), 165–194. https://doi.org/10.1108/JEDT-03-2014-0012
Karim, N.A.A., Rahman, I.A., Memmon, A.H., Jamil, N., & Azis, A.A. Abd. (2012). Significant risk factors in construction projects: Contractor’s perception. 2012 IEEE Colloquium on Humanities, Science and Engineering, Chuser, 347–350. https://doi.org/10.1109/CHUSER.2012.6504337
Lehtiranta, L. (2011). Relational Risk Management in Construction Projects: Modeling the Complexity. Leadership and Management in Engineering, 11(2), 141–154. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000114
Leitch, M. (2010). ISO 31000:2009 - The new international standard on risk management: Perspective. Risk Analysis, 30(6), 887–892. https://doi.org/10.1111/j.1539-6924.2010.01397.x
Loosemore, M., Raftery, J., Reilly, C., & Higgon, D. (2006). Risk Management in Projects (Second). Taylor & Francis. http://www.amazon.co.uk/Risk-Management-Projects-Martin-Loosemore/dp/0415260566
Lundqvist, S.A. (2014). An Exploratory Study of Enterprise Risk Management. Journal of Accounting, Auditing & Finance, 29(3), 393–429. https://doi.org/10.1177/0148558X14535780
Manab, N.A. (2009). Enterprise-Wide Risk Management (EWRM) implementation, compliance and value creation among Public Listed Companies (PLCs) in Malaysia [PhD thesis]. UniversitiTeknologi MARA.
Martens, M.L., & Carvalho, M.M. (2016). The challenge of introducing sustainability into project management function: multiple-case studies. Journal of Cleaner Production, 117, 29–40. https://doi.org/10.1016/j.jclepro.2015.12.039
Mileto, C., Vegas, F., Soriano, L., & Cristini, V. (2014). Earthen Architecture: Past, Present and Future (C. Mileto, F. Vegas, L. Soriano, & V. Cristini, Eds.). CRC Press. https://doi.org/10.1201/b17392
Monetti, E., Silva, S.A.R., & Rocha, R.M. (2006). The Practice of Project Risk Management in Government Projects: a Case Study in São Paulo City . Construction in Developing Countries: New Issues and Challenges, January 1–9.
Moraru, R. I. (2012). Risk management for the future: Theory and Cases. https://doi.org/10.5772/1809
Otobo, O.O. (2016). Risk Management System to Guide Building Construction Projects in Developing Countries: A Case Study of Nigeria (Issue February) [PhD Thesis]. University of Wolverhampton.
Pacheco-Torgal, F., & Jalali, S. (2012). Earth construction: Lessons from the past for future eco-efficient construction. Construction and Building Materials, 29, 512–519. https://doi.org/10.1016/j.conbuildmat.2011.10.054
Petzet, M., & Koenigs, W. (2015). Yemen – Heritage at Risk!.Heritage at Risk, 195–198. https://doi.org/http://dx.doi.org/10.11588/hr.2000.0.22520
PMI. (2017). A guide to the project management body of knowledge (PMBOK® guide) (Sixth). Project Management Institute (PMI).
Pritchard, C.L. (2015). Risk Management: Concepts and Guidance (Fifth). Taylor & Francis Group. www.crcpress.com
Purdy, G. (2010). ISO 31000:2009 - Setting a new standard for risk management: Perspective. Risk Analysis, 30(6), 881–886. https://doi.org/10.1111/j.1539-6924.2010.01442.x
Raz, T., & Hillson, D. (2005). A Comparative Review of Risk Management Standards. Risk Management, 7(4), 53–66. https://doi.org/10.1057/palgrave.rm.8240227
Said, H., & Berger, L. (2014). Future Trends of Sustainability Design and Analysis in Construction Industry and Academia. Practice Periodical on Structural Design and Construction, 19(1), 77–88. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000181
Schmit, J.T., & Roth, K. (1990). Cost Effectiveness of Risk Management Practices. The Journal of Risk and Insurance, 57(3), 455. https://doi.org/10.2307/252842
Schroeder, H. (2016). Sustainable Building with Earth. Springer International Publishing. https://doi.org/10.1007/978-3-319-19491-2
Serpell, A., Ferrada, X., Rubio, L., & Arauzo, S. (2015). Evaluating Risk Management Practices in Construction Organizations. Procedia - Social and Behavioral Sciences, 194(October 2014), 201–210. https://doi.org/10.1016/j.sbspro.2015.06.135
Sharma, S.K., & Swain, N. (2011). Risk Management in Construction Projects. Asia Pacific Business Review, 7(3), 107–120. https://doi.org/10.1177/097324701100700310
Siegel, P.B., &Alwang, J. (1999). An Asset-Based Approach to Social Risk Management : A Conceptual Framework (Issue 9926).
Silvius, G., & Schipper, R.P.J. (2014). Sustainability in project management: A literature review and impact analysis. Social Business, 4(1), 63–96. https://doi.org/10.1362/204440814X13948909253866
Svensson, G., & Wagner, B. (2015). Implementing and managing economic, social and environmental efforts of business sustainability. Management of Environmental Quality: An International Journal, 26(2), 195–213. https://doi.org/10.1108/MEQ-09-2013-0099
Tah, J.H.M., & Carr, V. (2001). Knowledge-Based Approach to Construction Project Risk Management. Journal of Computing in Civil Engineering, 15(3), 170–177. https://doi.org/10.1061/(ASCE)0887-3801(2001)15:3(170)
Teller, J., & Kock, A. (2013). An empirical investigation on how portfolio risk management influences project portfolio success. International Journal of Project Management, 31(6), 817–829. https://doi.org/10.1016/j.ijproman.2012.11.012
Uher, T.E., & Toakley, A.R. (1999). Risk management in the conceptual phase of a project. International Journal of Project Management, 17(3), 161–169. https://doi.org/10.1016/S0263-7863(98)00024-6
Vos, R.O. (2007). Defining sustainability: a conceptual orientation. Journal of Chemical Technology & Biotechnology, 82(4), 334–339. https://doi.org/10.1002/jctb.1675
Wang, S.Q., Dulaimi, M.F., & Aguria, M.Y. (2004). Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(3), 237–252. https://doi.org/10.1080/0144619032000124689
Willumsen, P., Oehmen, J., Stingl, V., & Geraldi, J. (2019). Value creation through project risk management. International Journal of Project Management, 37(5), 731–749. https://doi.org/10.1016/j.ijproman.2019.01.007
Phu, T.Q. (2017). Enterprise Risk Management Implementation : The Critical Success Factors For Vietnamese Construction Companies. Journal of Multidisciplinary Engineering Science Studies, 3(2): 1365–1379.